Urban Infrastructure Improvement : Tripura Urban & Tourism Development Project (TUTDP)

Cluster II A: Package No. TUDA/R & SD -02/P-05
Bishramganj | Melaghar | Udaipur | Amarpur | Belonia Town
Click to Enlarge

1. Bishramganj

    Scope of Work:

  • Roads: Construction of 5 nos. ICB Road (Total Length: 2.962 KM)
  • Drains: Construction of 9 nos. storm water RCC Box Drain (Total Length: 4.060 KM)

Click to Enlarge



2. Melaghar Town:

    Scope of Work:

  • Roads: Construction of 1 nos. ICB Road (Total Length: 0.324 KM)

  • Drains: Construction of 4 nos. Storm water RCC Box Drain (Total Length: 2.816 KM).





1. Udaipur Town:

    Scope of Work:
  • Roads: Construction of 3 nos. ICB Road (Total Length: 0.551 KM) 1 side Footpath (Length -1.210)

  • Drains: Construction of 3 nos. storm water RCC Box Drain(Total Length: 4.278 KM)

Click to Enlarge
Click to Enlarge



4. Amarpur Town:

    Scope of Work:

  • Roads: Construction of 1 no. ICB Road (Total Length: 0.300 KM)

  • Drains: Construction of 2 nos. storm water RCC Box Drain(Total Length: 1. 497 KM).





5. Belonia Town:

    Scope of Work:
  • Roads: Construction of 1 no. ICB Road (Total Length: 0.408 KM)

  • Drains: Construction of 2 nos. storm water RCC Box Drain(Total Length: 2.151 KM).

Click to Enlarge