Urban Infrastructure Improvement : Tripura Urban & Tourism Development Project (TUTDP)

Cluster II A: Package No. TUDA/WS-02/P-02
Bishramganj | Melaghar | Udaipur | Amarpur | Belonia Town
Click to Enlarge


1. Bishramganj Town:

    Scope of Work:
  • DTWs : 6 Nos (10000 GPH each capacity)-(1 Nos 5000GPH, 2Nos 7500 GPH,1 Nos 10000 GPH,2 Nos 20000GPH)
  • IRP : 3 Nos ( 2 Nos 7500 GPH1 No 5000 GPH)
  • OHR : 3Nos (200 KL, 250 KL, 300 KL, Stg. Ht.-18 M)
  • RWRM: 5.17 KM
  • CWRM : 0.4 KM
  • Distribution Network : 39.18 KM
  • Bulk water Meter : 12 Nos
  • Consumer Water Meter : 2998 Nos
Click to Enlarge



2. Melaghar Town:

    Scope of Work:

  • OHR : 1Nos (450 KL, Stg. Ht.-18 M)

  • CWRM : 2 KM

  • Distribution Network : 15.669 KM

  • Bulk water Meter : 4 Nos

  • Consumer Water Meter : 4621 Nos

Click to Enlarge

3. Udaipur Town:

Scope of Work:
Intake (12 MLD)
WTP- 7.6 MLD
OHR : 2Nos (900 KL, St. Ht.: 24 M,750 KLD, St. Ht.: 18 M )
RWRM 0.84 KM
CWRM 9.69 KM
Distribution Network-26.831 KM
Bulk water Meter-7 Nos
Consumer Water Meter : 11485 Nos



Click to Enlarge


4. Amarpur Town:

    Scope of Work:

  • Distribution Network : 10. 58 KM

  • Bulk water Meter : 10 Nos

  • Consumer Water Meter : 3597 Nos




5. Belonia Town

Click to Enlarge

5. Belonia Town:

    Scope of Work:
    DTWs : 5 Nos (10000 GPH each capacity)
    IRP : 5 Nos ( 10000 GPH Each Capacity)
    OHR: 2 Nos(400KL, 300KL, St. Ht-18 M Stg. Ht.-18 M)
    RWRM: 25 KM
    CWRM : 4.05 KM
    Distribution Network : 19.45 KM
    Bulk water Meter : 5 Nos
    Consumer Water Meter : 6692 Nos