Urban Infrastructure Improvement : Tripura Urban & Tourism Development Project (TUTDP)

Cluster III A: Package No. TUDA/WS-03/P-03
Dharmanagar | Kailasahar | Kumarghat | Ambassa Towns
Click to Enlarge

1. Dharmanagar Town:

    Scope of Work:
    Intake : 14 MLD
    WTP : 10.8 MLD
    OHR : 2 Nos (350 KL, 250 KL Stg. Ht.-18 M)
    RWRM: 0.1 KM
    CWRM : 1.235 KM
    Distribution Network : 18.18 KM
    Bulk water Meter : 9 Nos
    Consumer Water Meter : 11997 Nos



Click to Enlarge

2. Kailasahar Town:

    Scope of Work:
    Intake : 4 MLD
    WTP : 2.45 MLD
    OHR : 2 Nos (350 KL, 250 KLStg. Ht.-18 M)
    RWRM: 0.99 KM
    CWRM : 3.23 KM
    Distribution Network : 29.14 KM
    Bulk water Meter : 6 Nos
    Consumer Water Meter : 7594 Nos



Click to Enlarge

3. Kumarghat Town:

    Scope of Work:
    Intake : 3.3 MLD
    WTP : 2.3 MLD
    OHR : 1 Nos (250 KL Stg. Ht.-18 M)
    RWRM: 0.1 KM
    CWRM : 1.8KM
    Distribution Network : 40.89KM
    Bulk water Meter : 4 Nos
    Consumer Water Meter : 6599 Nos






2. Ambassa Town:

    Scope of Work:

  • DTWs : 4 Nos (10000 GPH each capacity)

  • IRP : 4 Nos (10000 GPH each capacity)

  • OHR : 1Nos (600 KL, Stg. Ht.-18 M)

  • RWRM: 2 KM

  • CWRM : 4.4 KM

  • Distribution Network : 20.27 KM

  • Bulk water Meter : 4 Nos

  • Consumer Water Meter : 4753 Nos